Forest Beach Fronius BYD Installation

Summary

The high-energy user sought a solution to cut energy costs and ensure backup power during the frequent outages in winter months. A Fronius Plus inverter, paired with 7.4kW of solar panels and a 22kWh BYD battery system, was installed. This system is capable of supplying an annual total of 12,142 kWh and offers up to 5KVA of backup power. It has substantially lowered the owner’s energy consumption and provided grid independence.

Gallery

Balingup Tesla Powerwall Install

Summary

This rural property in Balingup had a standalone power system installed in 2020 to supply power for a small shed and dwelling. Four years later, with a large home constructed on the property, the system was found to be undersized for their needs. After receiving a substantial quote from the network provider to install grid power, a system upgrade was deemed the best solution. An additional 6.6kW of solar and an extra 13kWh Tesla battery were installed to integrate with the existing system. The system can now efficiently support the property.

Gallery

Scott River Farm Upgrade

Summary

The proposal for an additional dwelling and solar installation on this three-generation-old cattle farm necessitated electrical upgrades to ensure efficient and safe operation. The undersized submains were enhanced to support the increased load and solar export, while switchboards in various locations were upgraded to replace outdated rewireable fuses with RCD protection. Additionally, a backup generator was installed at the main house to provide power during occasional outages.

Gallery

Mandalay Holiday Resort Media Hub

Summary

The challenge of this project was to maintain the electrical supply to the reception building during a period of heavy construction. The power supply from the existing building was rerouted to a temporary location to ensure the attached building remained operational throughout the demolition and construction phases, and was then redirected back upon completion. The installation of the new media hub featured LED panel lighting in all office and conference areas, along with CAT 6 data cabling for the conference equipment. Additionally, the existing solar and generator backup systems were reinstalled in the new building.

Gallery

Muir’s Ford & Nissan Expansion

Summary

With the addition of a new mechanical workshop, SWHE was tasked with installing new vehicle hoists, three-phase power, and additional lighting. Four 20-amp, three-phase, four-post hoists were installed to service the newly arrived Ford F150s, and three more two-post hoists were added to expand the existing service department. Three-phase power was also installed for various workshop equipment such as compressors, tire changing machines, and pressure cleaning equipment. Furthermore, an additional service entrance was constructed, LED lighting was installed, and existing exterior lights were upgraded to LED alternatives.